Skip to content

Textile Trainer

  • Fiber
    • Man Made Fiber
    • Natural Fiber
  • Yarn
    • Long Staple
    • Short Staple
  • Fabric
    • Weaving
    • Non-Woven
    • Knitting
    • FSD
  • Wet Process
    • Dyeing
    • Finishing
    • Printing
  • TTQC
  • Textile Calculation
  • Apparel
  • Washing Technology
  • Lab Report
    • Apparel
    • Fabric
    • TTQC
    • Wet Process Lab
    • Yarn Lab
  • Home
  • About
  • Objective
  • Mission
  • Author
  • Contact

Textile Trainer

We Assist You To Be A Perfect Textile Engineer

  • Fiber
    • Man Made Fiber
    • Natural Fiber
  • Yarn
    • Long Staple
    • Short Staple
  • Fabric
    • Weaving
    • Non-Woven
    • Knitting
    • FSD
  • Wet Process
    • Dyeing
    • Finishing
    • Printing
  • TTQC
  • Textile Calculation
  • Apparel
  • Washing Technology
  • Lab Report
    • Apparel
    • Fabric
    • TTQC
    • Wet Process Lab
    • Yarn Lab
Diagram of Pirn Winding Machine 0

Fabric / Lab Report

January 21, 2024

 by Kazi Md. Rashedul Islam · Published January 21, 2024 · Last modified August 4, 2025

Yarn Passage Diagram of Pirn Winding Machine

Spread the love

Spread the loveExperiment Name: Lab Report: Study on yarn passage diagram of pirn winding machine Introduction: A pirn package is the package which is placed inside a shuttle in a shuttle loom. Through the...

Layout Plan of Fabric Lab 0

Fabric / Lab Report

January 21, 2024

 by Kazi Md. Rashedul Islam · Published January 21, 2024 · Last modified August 4, 2025

Effective Layout Plan of Fabric Lab/Lab Report-01

Spread the love

Spread the loveExperiment Name Lab Report: Study on layout plan of fabric engineering lab. Introduction Plant layout refers a systematic and efficient functional arrangement of various machines, equipment, tools, furniture etc. in such a...

Bobbin Building Mechanism 0

Short Staple / Yarn

January 20, 2024

 by Kazi Md. Rashedul Islam · Published January 20, 2024 · Last modified July 30, 2025

Bobbin Building Mechanism of Speed Frame: Easy 3 Step

Spread the love

Spread the loveIntroduction The bobbin building mechanism in a speed frame is a critical component in the process of transforming sliver into yarn. The speed frame is an essential machine in the spinning mill,...

Belt Shifting Mechanism 0

Short Staple / Yarn

January 18, 2024

 by Kazi Md. Rashedul Islam · Published January 18, 2024 · Last modified July 30, 2025

Belt Shifting Mechanism of Speed Frame with Proper Simple Figure

Spread the love

Spread the loveIntroduction Belt shifting mechanism of speed frame is described in this article. Fibers are converted into low twist yarn called roving using the Simplex intermediate process. It is not suitable for yarn...

  • « Previous Page
  • Next Page »

Popular Posts

Welcome to Textile Trainer.
Here, you will find a wealth of information on the fascinating field of textile engineering, which is the application of scientific and engineering principles to the design and production of textile products.

Welcome to Textile Trainer.
Here, you will find a wealth of information on the fascinating field of textile engineering, which is the application of scientific and engineering principles to the design and production of textile products.

  • Home
  • Privacy Policy
  • Cookie Policy
  • Disclaimer
  • Terms and Conditions
  • Contact

Textile Trainer © 2025 All Rights Reserved. | Quick Dry Fabric Tester |

Powered by  - Designed with the Hueman theme